| IMPORTANT: For successful inspection scheduling: |
- Provide valid
information in all required fields (required fields
are indicated with asterisks (*).
- To
schedule a subcontractor inspection, (such as plumbing,
or electric, etc...) please use the corresponding subcontractor
permit number.
- Ensure
all required inspections have passed prior to scheduling
the next inspection in a sequence (example... rough
electric, plumbing and AC prior to a framing inspection).
|
Inspections
requested prior to 4:00 pm will be scheduled for the next
business day if there are no extenuating circumstances. |
| If
the inspection is not scheduled for some reason you will
be notified the next business day through the phone number
or e-mail provided. |
| To
cancel an inspection, please call 561-642-2052 no later
than 8:30 am the day of the inspection to avoid a re-inspection
penalty fee. |